空壓機(ji)長期停放注(zhù)意事項
2025-12-15 10:17:34 點擊(ji):
空壓機的停(ting)用在各個單(dān)位都常有發(fa)生。那麼在初(chu)次開💯機前空(kōng)壓機停放時(shí)間超過三個(gè)月或空壓機(ji)🐇停用時間超(chāo)過三個月,再(zai)次開機前需(xū)要采取有效(xiào)🌈措施,bi須先請(qǐng)專業空壓機(ji)人員對機器(qi)進行保養檢(jian)測,制定安全(quán)措施,避免開(kāi)機後🌐發生不(bú)良狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢(jiǎn)查電路狀态(tai),是否正常供(gong)電,電壓是否(fou)穩定;測量電(diàn)動機絕緣電(diàn)阻,數值大于(yu)1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查空壓機(ji)配件上是否(fou)含有積水,灰(hui)塵,及時清理(li)。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出(chu)氣口全面檢(jian)測,防止發生(shēng)堵塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在(zài)上述都已經(jīng)完成的情況(kuang)可以接通電(dian)源,查看電⛷️腦(nao)控制器是否(fǒu)正常運行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更(gèng)換三濾和潤(run)滑油。因為在(zai)長期不用的(de)情況下,三濾(lǜ)🈚,油🥰可能發生(shēng)老化現象,從(cong)而造成空壓(yā)機開機運行(háng)時間不長即(ji)結膠積碳或(huo)堵塞,油路不(bu)暢使空壓機(jī)主機或其他(tā)⭐零部件🔴損壞(huai)。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試(shì)機,電路改造(zao)後人工控制(zhi)加載卸載,先(xiān)🚶空載運行🐪10分(fen)鐘以上,檢測(ce)各項指标和(he)震動、噪音等(deng)⛱️正常,再進行(hang)加載,查🌍看各(gè)部件運行正(zhèng)常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.