開山空壓機過載停機之分析_開山空壓機|鑿岩機|潛孔鑽機-浙江開山牌壓縮機杭州銷售代理
給開山留言(yan) | 網站地圖
開山空(kong)壓機過載停(tíng)機之分析
2025-12-13 10:30:00      點(dian)擊:
開山空壓(ya)機的運用者(zhe)們必定有遇(yu)到過主機或(huò)電機過載而(ér)🏃🏻停機的問題(ti),不要擔憂,鞍(ān)山市興盛空(kōng)壓機有限公(gōng)💯司為你們✌️分(fen)憂解難。

The operators of Kaishan Air Compressor must have encountered the problem of the main engine or motor overload and shutdown. Don't worry, Anshan Xingsheng Air Compressor Co., Ltd. will share your worries and solve your difficulties.



一、電(dian)壓太低:

First, the voltage is too low:



一般(ban)的開山空壓(ya)機額外工作(zuò)壓力為380V,上下(xia)答應起🐪浮在(zài)☁️5%左右。這裡所(suǒ)說的電壓是(shì)機器正常工(gong)作的電壓,因(yīn)為許多工地(di)上(工廠電壓(yā)供給比較安(an)穩一般不會(hui)有這種情況(kuàng))變壓器比較(jiào)小,設備沒有(yǒu)開的時分電(dian)壓有400V,可是設(shè)備💜一開電壓(ya)就掉到350V,正常(chang)工作起來電(dian)壓隻要360V,短期(qi)運用問題不(bú)大,假設⭕長時(shi)間運用,勢必(bi)對電器系♌統(tong)構成極大的(de)損傷。

The additional working pressure of the general hill-opening air compressor is 380V, and the upper and lower promises to float at about 5%. The voltage mentioned here is the normal working voltage of the machine, because the transformer is relatively small on many construction sites (the factory voltage supply is relatively stable, generally does not have this situation) and the time voltage when the equipment is not open is 400 V, but when the equipment is open, the voltage drops to 350 V. The normal working voltage is only 360V. The short-term operation is not a big problem. Assuming long-term operation, it is bound to be applied to the electrical system. It constitutes great damage.



二、開山(shan)空壓機機組(zǔ)壓力逾越額(é)外壓力:

2. The pressure of the air compressor unit exceeds the additional pressure.



比如(ru)0.7MPa的機器,實踐(jiàn)壓力抵達0.75MPa,就(jiù)簡單出現過(guò)載現象。7公斤(jin)的空壓🏃🏻機不(bú)要調到8公斤(jin)用。榜首,平安(an)得不到😄保證(zhèng),第二,設備耐(nài)壓也不行,壽(shou)數減短。所以(yi)需求多大壓(yā)力,就選購相(xiang)對應壓力的(de)空壓機。

For example, when the practical pressure of a 0.7 MPa machine reaches 0.75 MPa, overload simply occurs. 7 kg air compressor should not be adjusted to 8 kg. No. 1, safety is not guaranteed. Secondly, the equipment can not withstand voltage and the life is shortened. So as much pressure as the demand is, choose the air compressor with the corresponding pressure.



三、接(jiē)線松動:

3. Loose wiring:



查看(kan)輸入螺杆空(kōng)壓機電源線(xian)能否有發熱(rè)燒焦的痕迹(jì),首要查💰看一(yi)下三相電壓(ya)線,若有松動(dong)或短路情況(kuang),那麼給予‼️重(zhòng)接⚽就好了。

To check whether the power supply line of the input screw air compressor has traces of heating and scorching, the first thing is to check the three-phase voltage line. If there is loosening or short circuit, then it is better to reconnect.



四(sì)、開山空壓機(ji)接觸器毛病(bing):

4. Contactor faults of mountain air compressor:



接觸器裡邊(biān)的觸頭老化(hua),吸合不良,接(jiē)觸面就小,電(diàn)流就🏃🏻‍♂️大了,空(kōng)壓機過載是(shi)小事,電氣系(xi)統焚毀才是(shì)我們不願意(yì)看到的工作(zuo)。

Contacts inside the contactor aging, poor suction, contact surface is small, the current is large, air compressor overload is a trivial matter, electrical system burning is the work we do not want to see.



五、開山空壓(yā)機油氣别離(li)芯堵塞:

5. Blockage of oil and gas separated from core in mountain air compressor:



油分(fèn)芯堵塞,内壓(ya)高了,負載大(dà)了,電流就高(gāo)了,所以會過(guò)載。誤區:不要(yao)認為新換沒(mei)多久的東西(xī)就不堵,現場(chǎng)環境髒,油氣(qì)桶裡邊雜質(zhì)多都簡單使(shi)油分芯堵塞(sāi)。新換的油分(fèn)芯,環境也還(hái)能夠,可是工(gōng)作200小時又堵(du)塞了,這是和(hé)油分芯質量(liàng)有聯系的。

The oil core is blocked, the internal pressure is high, the load is large, the current is high, so it will overload. Misconception: Do not think that new things will not be blocked soon, the site environment is dirty, and many impurities in the oil and gas barrel simply make the oil core separation blocked. The new oil core separation, the environment is also possible, but the work of 200 hours and blocked, which is related to the quality of oil core separation.

  報(bào)錯